FOB Price
Get Latest Price|
300 Meter Minimum Order
Country:
China
Model No:
SHD-GC 2kV, 5kV, 8kV, 15kV, 25kV
FOB Price:
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
300 Meter
Packaging Detail:
Plastic packing or Wooden drum
Delivery Time:
15 work days
Supplying Ability:
40000 Kilometer per Year
Payment Type:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other
Product Group :
-
China
Contact Person Mr. Jason
No.8,Yuandong Road,Gaocheng Town, No.8,Yuandong Road,Gaocheng Town, No.8,Yuandong Road,Gaocheng Town, Wuxi, Jiangsu
2XS(FL)2Y *8/*6kV *6/**2kV
**7/**0kV
Cu/EPR/CPE
Application
SHD-GC heavy
duty cables are Designed for longwall shearers,continuous
miners, loaders, drills, conveyors, pumps & mobil,pumps &
mobile equipment. where grounding conductors, a ground check
conductor & metallic shielding are required.
Construction
Conductor: Stranded annealed tinned copper conductor
Insulation: Ethylene Propylene Rubber(EPR)
Insulation shielding: Non-conducting tape + Tinned copper/textile
braid.
Ground check conductor:Tinnedcopper conductor with a yellow
polypropylene insulation
Grounding conductor:Tinnedcopper conductor
Outer sheath:Reinforcedextra-heavy-duty
Chlorinated Polyethylene(CPE)
Options: Other jacket materials such as CSP/PCP/NBR are available
upon request. Two-layer jacket with reinforcing fibrebetween the
two layers can be offered as an option.
Sheath Marking: Manufacture name (trademark) and type,
Production year/week or batch number,Metre-marked.
MORE DETAILED PLEASE SEE THE ATTACHMENT!
Country: | China |
Model No: | SHD-GC 2kV, 5kV, 8kV, 15kV, 25kV |
FOB Price: | Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 300 Meter |
Packaging Detail: | Plastic packing or Wooden drum |
Delivery Time: | 15 work days |
Supplying Ability: | 40000 Kilometer per Year |
Payment Type: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal, Other |
Product Group : | - |