FOB Price
Get Latest Price4800 ~ 78000 USD / Unit
|1 Unit Minimum Order
Country:
China
Model No:
QDCK
FOB Price:
4800 ~ 78000 USD / Unit Get Latest Price
Place of Origin:
Qingdao
Price for Minimum Order:
4800 per Unit
Minimum Order Quantity:
1 Unit
Packaging Detail:
standerd exported package
Delivery Time:
30 days after received the deposit
Supplying Ability:
50 Set per Month
Payment Type:
T/T, L/C
Product Group :
-
China
Contact Person Juicy
Qingdao, Shandong
Principle of work
The integrated sewage treatment equipment elimination organic
matter pollutant and the ammonia nitrogen mainly according to
depend in equipment,s AO biological treatment craft. And the
principle od work is in a level, because the sewage organic matter
density is very high, the microorganism is at the anoxic condition,
the time the microorganism is the optional microorganiam, they
decompose the sewage in organic nitrogen transformation
NH*-N,simultaneously uses the organic carbon to take the electron
donor,NO*-N,NH*-N transforms N2,moreover also synthesizes the new
cellular substance using the part organic carbon carbon source and
NH*-N,therefore a level pond not only has certain matter
elimination function, reduces the following good oxygen pond the
organic load, favors the nitrification advance, moreover according
to the high density organic matter which exists depending on the
raw water, completes the denitrification, disappears finally the
denitrogenation eutrophication pollution. In O levels, because the
organic matter density reduced large scale, but still had the
ration organic matter and the high NH*-N existence,to enable the
organic matter to obtain further oxygenolysis, simultaneously in
the carbonification is in completes in the situation the
nitrification to be able to carry on smoothly, in o level of
establishment organic load low good oxygen biology contact
oxidation pond, mainly has the good oxygen microorganism and form
the oxygen bacterium in o level of ponds(nitrifying bacteria ).And
the good oxygen microorganism decomposes the organic matter CO2 and
H2O;From the oxygen bacterium(nitrifying bacteria)produces using
the organic matter decomposition in the inorganic carbon or air CO2
takes the nutrition source, transforms the NO*-N,NO*-N,o level pond
sewage in NH*-N the water leakage partial refluxes to a level pond,
is a level pond provides the electron acceptot. Disappears finally
through the denitrification the denitrogenation pollution.
Performance features:
1. Used international advanced biological treatment processes,set
to remove BOD5,COD,NH*-N in one,with stable performance and
reliable technology,good effect,low investment,small footprint,easy
maintenance and so on.
2. Equipment can be embedded in the ground, surface above the
equipment can be used as green or other land ,not housing and
heating ,insulation.
3. Two biological contact oxidation process are the use of
plug-flow biological contact oxidation, the treatment is better
than completely mixed or two series completely mixed biological
contact oxidation pond.
4. Activated sludge volume is small, the water quality of
adaptability, resistance to shock loading performance, water
quality and stability will not result in sludge bulking.
5. Pool using a new flexible three-dimensional packing ,larger
surface area, easy to hang microbial film, stripping. The same
organic load conditions, high removal rate, can increase the oxygen
in the air solubility in the water.
6. Biochemical use of biological contact oxidation pond, and its
relatively low filler volume loading,micro-organisms in their
oxidation stage, producing less sludge,only three months( *0 days)
above a row of mud( with a truck into a mud suction or dehydration
cake Sinotrans).
7. Deodorant manner in addition to conventional high-altitude
exhaust, comes with soil deodorization measures.
8. Equipped with automatic control systems and electrical equipment
failure alarm system,safe and reliable operation,usually dont need
someone to manage,only timely maintenance and repair of equipment.
Country: | China |
Model No: | QDCK |
FOB Price: | 4800 ~ 78000 / Unit Get Latest Price |
Place of Origin: | Qingdao |
Price for Minimum Order: | 4800 per Unit |
Minimum Order Quantity: | 1 Unit |
Packaging Detail: | standerd exported package |
Delivery Time: | 30 days after received the deposit |
Supplying Ability: | 50 Set per Month |
Payment Type: | T/T, L/C |
Product Group : | - |