Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Vibratory Hammer (DZJ-120)
Next

Vibratory Hammer (DZJ-120)

FOB Price

Get Latest Price

( Negotiable )

|

1 Set Minimum Order

Country:

China

Model No:

DZJ-120

FOB Price:

( Negotiable ) Get Latest Price

Place of Origin:

fujian

Price for Minimum Order:

-

Minimum Order Quantity:

1 Set

Packaging Detail:

wood crates

Delivery Time:

Lead time 15-25days

Supplying Ability:

20 Set per Month

Payment Type:

Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T

Contact Now
Free Member

Contact Person Melody

Rm 139 No .100 Nanshan road, Xiamen, Fujian

Contact Now

Product Specification

  • Brand Name: Yongan
  • Motor Power:Power 120KW
  • Payment Terms::L/C,T/T,Western Union
  • Delivery Time::Lead time 15-25days
  • Minimum Order Quantity:1 Set/Sets
  • Packaging Details::wood crates
  • Hammer Material:Steel
  • Model:DZJ-120
  • Supply Ability::20 Set/Sets per Month

Product Description

Intruduction:

DZJ***0 is one of the most popular size vibratory hammer we had in our product line. It is easy to operate.

 

Vibratory hammer DZJ***0 Specification:

Moter power(Kw) : **0
Eccentric Moment(Nm) : **0
Driving force(Kn) : ****3
Speed(r/min) : *****0
Amplitude(Mm) : **7.*5
Maximum Line Pull(Kn) : **2
Length(m) : 2.1
Width(m) : 1.4
Height(m) : 2.6
Weight(kg): ***0

 

Hangzhou Bay Cross-Sea Bridge

Geology situation: silty sand
Construction situation:The diameter of the steel pipe sheet is *******0mm. The driving depth is *2m**6m.
Project situation: Totally invest **9.8 hundred million into Jiashao crossing sea bridge. The whole line is designed 8 lane according to express way construction standard. Plan to open the traffic in ***2. The bridge is from South lake transbay- the crossing of Fu hang yong express road and the Zhe Jia Su express road, to Gu zhu transbay –the crossing of Fuyong express way and Shangsan express way. The bridge crosses Ch'ien-t'angRiver and the whole lenth is *9.**2km. The main road lenth is ***0m. It will be the longest and widest multi towel cable-stayed bridge in the world.

 

 

The Cross-Sea Bridge Between Jiaxing and Shaoxing

 

 

The Second Minpu Bridge in Shanghai

 

 

the Changjiang tunnel-bridge between Chongming Island and Qidong City

 

 

Country: China
Model No: DZJ-120
FOB Price: ( Negotiable ) Get Latest Price
Place of Origin: fujian
Price for Minimum Order: -
Minimum Order Quantity: 1 Set
Packaging Detail: wood crates
Delivery Time: Lead time 15-25days
Supplying Ability: 20 Set per Month
Payment Type: Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Product Group : Electric vibratory hammer

Send a direct inquiry to this supplier

To:

Melody < SHANGHAI YONGAN MACHINERY CO., LTD >

I want to know: