FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
Geyee002
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
each mould with wooden case
Delivery Time:
45-50 days for the 1st mould test
Supplying Ability:
20 Set per Month
Payment Type:
T/T, Western Union
Product Group :
Contact Person Ms. Cathy
No.36,Kangzhuang Road, Taizhou, Zhejiang
Process:
Â
1.R&D |
We support customer R&D .Make the files or improve the design if you needed |
 |
|
2.Negotiation |
The quality , price, material, cavity, delivery time, payment item , ect. |
 |
|
3.Place an order |
According your own design or you chooses our design. |
 |
|
4.Mould |
According to customers' request to build the mould. Before make the mould, we sent mould design to customer approval first , before move forward to production , we send samples to customer to confirm first. |
 |
|
5.Sample shoot |
If the first sample come out is not satisfied customer, we modify the mould and until meet customers' satisfactory. |
 |
|
6.Products in store |
If your quantity is beyond of our storage, we will provide lead time to you. |
 |
|
7.Delivery |
Delivery goods by sea or by air, according customer’s requirement. |
Â
Â
Â
Technology
Â
1) Mould structure design
Professional designers provide you with reasonably designed mould to shorten cycle hours.
Reducing unnecessary procedure improves efficiency.
Â
2) Mould cooling system
According to the structural characteristics of the product and the appearance of the product , We design a reasonable form of gate for mould, such as a large gate, hidden gate, fan gate, needle gate, pin point gate etc., a reasonable channel of runner design make mold temperature balance in the shortest time to improve mould precision and productivity.
Â
3) Accessory for mould
Slide, guide pin, guide sleeve, lifter blocks and so on are taken by wear-resistant standard parts, to ensure the mould life.
Â
4) Deal with mould
 Quenching the mold, heat treatment to improve the hardness, then Nitriding temperature is lower , the mold will no longer need to quench mold with high surface hardness and wear resistance more than HV**0
Â
Service
1) We can repair the mould in one year for some free and provide technology.
2) ordering formand materials application are conducted in strict accordance withISO***1/ ISO****1 quality management.
3) High quality, attractive price.
                              Â
Â
Any questions, please feel free to contact with me.
Â
Country: | China |
Model No: | Geyee002 |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | each mould with wooden case |
Delivery Time: | 45-50 days for the 1st mould test |
Supplying Ability: | 20 Set per Month |
Payment Type: | T/T, Western Union |
Product Group : | crate |