FOB Price
Get Latest Price38500 USD / Unit
|1 Unit Minimum Order
Country:
China
Model No:
JZJ-1003
FOB Price:
38500 USD / Unit Get Latest Price
Place of Origin:
Xinxing,Henan,China
Price for Minimum Order:
38500 per Unit
Minimum Order Quantity:
1 Unit
Packaging Detail:
One 40 HQ and 20GP
Delivery Time:
20 Days
Supplying Ability:
10 Unit per Month
Payment Type:
T/T, L/C
Product Group :
Contact Person Jenny
YuLin Park, Xinxiang, Henan
External dimension of main machine(Diameter*Length)
***0****0mm, ***0****0mm, ***0****0mm
Raw material
Waste tire , Waste rubber, Waste plastic
Oil yield/day
Waste tire/rubber
Big tyres
*5%**0%
Car tyres
*0%
Bicycles and motorcycles tyres
*0%**5%
Waste Plastic
Fishing net ,
safety net, farm-oriented film
*5%**0%
Convenient bags, weave bags
*0%
Off-cut of recycled paper mill
*0%**0%
Structural Form
Horizontal
Capacity/day
**2 batch/day
Equipment Type
Universal Equipment
Operating pressure
Ordinary pressure
Power
Coal ,fuel gas , fuel oil , charcoal
Mode of cooling
Water-cooling
Working form
Continuous
*4 hour disposal amount
5/8/*0 tons raw material
*4 hour oil yield
Depends on oil output rate
Rotate speed of main equipment
0.4 turn/m
Power in total
9 KW/hour
Heating mode
Direct heating
Domestic pioneer of this technology
a. In its key installment decomposition processor design, has thoroughly overcome the disadvantages of the domestic present vertical flat base split processor, such as bottom partial being heated non-uniformity, easy to break, low output, short service-life is short and so on, the main engine uses horizontal-type **0ostructure*0.4 R/M
b. Fast practical feed-in and discharge system. The highest feed-in quantity of the XY*5 every *4 hour achieved 5 tons, Discharge time for **0kg carbon black only needs *0 minutes. The highest feed-in amount of the integral unit equipment every *4 hours achieves *5 tons.
c. Highly effectively gas&
Country: | China |
Model No: | JZJ-1003 |
FOB Price: | 38500 / Unit Get Latest Price |
Place of Origin: | Xinxing,Henan,China |
Price for Minimum Order: | 38500 per Unit |
Minimum Order Quantity: | 1 Unit |
Packaging Detail: | One 40 HQ and 20GP |
Delivery Time: | 20 Days |
Supplying Ability: | 10 Unit per Month |
Payment Type: | T/T, L/C |
Product Group : | 8tons Waste Tyre Pyrolysis Plant |