FOB Price
Get Latest Price100 ~ 1000 USD / Piece
|1 Piece Minimum Order
Country:
China
Model No:
MRD-L
FOB Price:
100 ~ 1000 USD / Piece Get Latest Price
Place of Origin:
hebei
Price for Minimum Order:
100 per Piece
Minimum Order Quantity:
1 Piece
Packaging Detail:
wooden case,
Delivery Time:
15days
Supplying Ability:
5000 Piece per Month
Payment Type:
Western Union, T/T
Product Group :
Contact Person Ms. lily
No.118 West Fuxing Road,Baoding city, Hebei province,China, Baoding, Hebei
Working condition and technical Index
3.1 Voltage Grade: 0.*8kv**6kv
3.2 Grid Frequency:*0Hz
3.3 Corresponding Terminals: If cable is wired-in from front(L1) of
CT, then L1and K1 is corresponding terminals.
3.4 Ambient Temperature: **0celsius - *0celsius
3.5 Altitude: be or lower than ***0m (If used highland , please
indicate when ordering)
3.6 Relative Humidity: daily averaged lower than *5%, monthly
averaged lower than *0%
3.7 Environmental Necessities: no conductive dust, mental or
corrosive gas or mycete which will damage insulation existing
around the site.
4. Installation Instructions
4.1 Integrated CT should be installed before laying cables, and
cables go through CT.
4.2 Open zero-sequence CT could be installed at any time and the
details as follows:
1)remover connecting presser of K1and K2 on CT.
2)After loosening and removal of inner hexagon bolts on the top of
CT, it comes into two parts.
3)Fix the CT on the cable, clean the two touching surface, coat
anti-rust oil, align the two parts and fasten inner hexagon
bolts.
4)Fix the connection sheets at K1 and K2 position.
Country: | China |
Model No: | MRD-L |
FOB Price: | 100 ~ 1000 / Piece Get Latest Price |
Place of Origin: | hebei |
Price for Minimum Order: | 100 per Piece |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | wooden case, |
Delivery Time: | 15days |
Supplying Ability: | 5000 Piece per Month |
Payment Type: | Western Union, T/T |
Product Group : | accessories |