FOB Price
Get Latest Price( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
PRW10-12F/200
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
Ningbo China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
Wooden Case
Delivery Time:
-
Supplying Ability:
100 Set per Month
Payment Type:
Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Product Group :
-
Contact Person Tony
No.1118, Tianan Road, Xiangshan, Ningbo, Zhejiang
This kind of fuse can be divided into 2 parts: fuse base and load
arc-extinguishing device.
While the fuse is in closing position, active and static
contactors will be pressed tightly by a compressed spring to
guarantee having an enough pressure between contractors. The rotary
torsion spring equipped in the lower end of the arc-extinguished
tube will be screwed tightly, once the fuse-element is put in the
tube. Then the fuse will be in a state of drawing tightly to ensure
the arc-extinguishing tube self-locked in a closing position. When
overload and short-circuit occurs, the fuse-element will be melted
and the fuse will be drawn out from the fuse tube by the torsion
spring. Meanwhile, a great deal of arc-extinguishing gas is
produced in the fuse tube by electric arc heat energy to extinguish
electric arc quickly, in order to save the time of arcing and
reduce the losses in arc-extinguishing material. After the
extinguishments, the fuse tube will be dropped out by its own
weight and the function of compressed spring with bridge
contractors, and an obvious disconnected section will
appear.
Country: | China |
Model No: | PRW10-12F/200 |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | Ningbo China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | Wooden Case |
Delivery Time: | - |
Supplying Ability: | 100 Set per Month |
Payment Type: | Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Product Group : | - |