FOB Price
Get Latest Price300,000 /
|Minimum Order
Place of Origin:
Jinzhou
Price for Minimum Order:
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
200
Payment Type:
-
Contact Person Mr. Jake
Longtou park, Jinzhou, Hebei
Gypsum board machinery feasibility report 1ãMarket forecasting The gypsum board is light, fire-resistantãwarmãinsulated and moisture resistance and it is the necessary material in the ceiling and interior decoration. The gypsum board becomes popular since ***9. In the recent years, the gypsum board capacity rises year by year and become the pillar industry. With the adjustment of national Industry Policy, the newly decoration material will be used in the big and small cities as well as home decoration. Thus, the gypsum board has spacious potential market in these years. 2ãRequired conditions Take the 4 million square meter as an example, it should meet the following standard: ï&frac*4;1ï&frac*4;Electricity supplyï&frac*4;The total power supply should be **0KW(including the residents electricity). ï&frac*4;2ï&frac*4;Water supplyï&frac*4;6 Cubic Meters/hour ï&frac*4;3ï&frac*4;The total floor area is about ***0 square metersï&frac*4;workshop about***0 square meters. ï&frac*4;4ï&frac*4;Have good transport and telecommunication services. 3ãEnvironment Protection The main ingredient is gypsum powder(natural gypsumãardealite). All the process is equipped with dust-collect system, wonât pollute the environment. The heat supply device is hot-oil conductive boiler; its emission concentration meets the national standard. 4ãThe gypsum board process is as followingï&frac*4; Plaster hopper**-mixing**-shaping**-freezing**-first cutting**-drying **-detailed cutting**-packing**-finished products 5ãRaw material consumptionï&frac*4;square meterï&frac*4; gypsum powderï&frac*4;6.8kgãshielding paperï&frac*4;0.5kgãcoal0.9kgãstarchï&frac*4;*0gãfoaming agentï&frac*4;5gãglueï&frac*4;*0gãelectricityï&frac*4;0.3kwh 6ãstaffing: take the 4 million ***** production line as an exampleï&frac*4;it will need office staff 5 people and workers*2 people (namely *7 people) per shift. 7ãConstruction Progress: Project ApprovalãProcess Layoutãcivil engineering equipment selectionãproduction installation and commissioning. It will need about 5 months. 8ãconclusion aï&frac*4;It is Newly green decoration material, little investment, high reward, suitable for small and medium-sized company. bï&frac*4;The gypsum board has a potential market; it is the necessary internal decoration material. It will develop very quickly in the near future. Little investment, high reward and little period