FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1pc
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Contact Person Ms. Jocelyn
Yungu Road 201,Jiangyin, Wuxi, Jiangsu
All the processes are controlled by HMI and PLC. The horizontal and vertical cutting are finished while block transportion.Different block thickness is reachable by changing cutter angle which is controlled by ***** cross cutting, the diagonal tolerance of rectangle block can be controlled within 1.5mm