FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
qingdao
Price for Minimum Order:
-
Minimum Order Quantity:
1x20'FCL
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
200 TON
Payment Type:
-
Contact Person Mr. Jason
jiaozhou, Qingdao, Shandong
Pruduct Name ï&frac*4;šscaffolding Detail: The above photo is our logo on alibaba. It is two main products of all our products. Frame scaffolding: components of assembling 1.wooden planks- clean site and lay the wooden planks at the ground in horizontal position. 2.jack base- it is a base seat for adjusting and fixing the required scaffolding length above the wooden planks. ***** frame- insert the main frame into jack base section in per pendicular position. ***** brace- for fixing the main frame in each span of scafolding. 5.joint pin- insert into the top of main frame for joining the required dimension. 6.horizontal frame or catwalk(steel scaffolding plank)- it is a lateral pipe for frmaes used for fixing the main frame to complete the first floor scaffolding.(it can be erected with about 2 to 4 spans in each high rising floor alternately) 7.Wall tie(keeper joint)- use wall tie to prevent the frames from swaying down due to strong wind and unstable ground. Fasten the ties to walls every 4 span horizontally and every 4 frame , vertically. Noteï&frac*4;š-Fix the open-end frames firmly at their conners using joint after assembled.