FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
Ireland
Price for Minimum Order:
-
Minimum Order Quantity:
20 Tonnes
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
5000
Payment Type:
-
Ireland
Contact Person Mr. marty
clane, clane, kildare
2nd HAND SKYDECK Aluminium Panel Slab Formwork ***** For slab thicknesses up to *5 cm With the SKYDECK drophead system, striking can be carried out after only one day (depending on the slab thickness and strength of the concrete). The drophead is released with a hammer blow which causes the formwork to drop *0 mm (panels and main beams). The panels can be separated easily from the concrete and immediately used for the next cycle. Furthermore, on-site material requirements are reduced. The SKYDECK main beam reduces the number of props needed – only one prop is required per slab area of 3.*5 m² for thicknesses up to *0 cm. This saves time and simplifies the transportation of formwork materials across the site. SKYDECK panels as well as main beams are equipped with self-draining edges. The edges of the panels are undercut which ensures cleaning is kept to a minimum and thus shorter shuttering times. The SKYDECK guarantees a straight support line at the end of the formwork. With system parts, these infill areas can be quickly formed with system components. Systematic assembly and a high degree of safety for standard bays as well as the slab edge is achieved using SKYDECK platforms. The SLT **5 main beam provides a cantilever of approx. 1.*0 m. The GS-approved SKYDECK SDB platform together with a foldable handrail frame is safely positioned by means of the SSH shuttering aid. The SKYDECK platform has a safe working load of **0 kg/m².