FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1
Packaging Detail:
-
Delivery Time:
wthin two weeks
Supplying Ability:
1000
Payment Type:
-
1. Introduction
PUXIN Household Household biogas digester system for waste treatmentis composed of a 6 or *0 m3 PUXIN biogas plant, pipe routes, gas purify devices and gas appliances or small power biogas generator.
PUXIN Household biogas digester system for waste treatmentismainly applied to farmhouse or domestic house to treat livestock waste, straw, human sewage and food waste.
2. Contrast between fixed dome and Puxin biogas plant
Contrast of the technical requirements for the builders
Items
The traditional fixed dome hydraulic biogas plant
The Puxin Biogas plant
Airtight craft
Highly required
Not required
Ability to understand blueprint
Highly required
Not required
Ability to build the arch
Highly required (build by hand)
Not required (cast by mould)
To judge and deal with gas leaking
Highly required
Required
To judge and deal with water leaking
Highly required
Required
Training period
About 3 month
About one week
Period to become a proficient builder
**2 years
About one month
Requirement of the people to be trained
Medium educated, strong ability to master skills
Not Educated, medium ability to master skills
Success rate
Not **0% guaranteed
**0% guaranteed
Contrast of the maintenance
Items
The traditional fixed dome hydraulic biogas plant
The Puxin Biogas plant
To mend the gas leak of gas-holder
Dangerous and difficult
The job is done inside the biogas digester, there is a possibility of poisoning.
The leak can not be found.
Safe and easy
The job is done on ground, there is no possibility of poisoning. The leak can be seen, and can be mended directly.
To mend the water leak of the digester
Dangerous
The digester’ outlet is too small that the air circulation in the digester is bad. So, there is a possibility of poisoning.
Safe
The digester’s outlet is large enough that the air circulation in the digester is good. So, there is no possibility of poisoning.
3. Construction process
4. Cost breakdown of *0 m3
Material (manpower)
quantity
Glass fibre reinforced plastic Gasholder
1
Smashed stone
4m3
Sand
3.5m3
cement
***0kg
Brick(*0×**0×**0mm)
**0
Plastic pipe (Φ**0×***0mm)
2
concrete bar (Φ6)
8kg
manpower
6 man×1 day (digging a hole)+
6 man×1 day (casting concrete)+
2 man×1 day (to build inlet, outlet and install pipe systems)
Earth work
*0 m3 (steel mould with outer)