FOB Price
Get Latest Price600 ~ 650 / Ton ( Negotiable )
|Minimum Order
Place of Origin:
hebei,China
Price for Minimum Order:
Minimum Order Quantity:
25 Ton
Packaging Detail:
Standard export bundle to be tied with strong steel strips and wrapped with plastic bags
Delivery Time:
10 days after order
Supplying Ability:
10000 Ton per Month
Payment Type:
L/C, T/T, Western Union
Contact Person Ms. Jinming
No.17,Beihai road, Cangzhou, Hebei
OD | 1/2"**2" |
WT | SCH*0,�SCH*0,�SCH*0,�SCH**0 |
Length | Random�length,�or�as�customer\'s�requirement |
Usage |
Boiler�tube,�transport�water�or�fluid,�shipping� building |
Tolerance |
OD:+/*0.*2mm WT:+/*0.*2mm |
Chemical�composition |
C**0MPa � |
Surface |
Black�painting,�black�varnish,�transparent�oil�to� avoid�rust |
End | Beveled�end,�plain�end |
Packing |
In�bundle�with�strip�fixed Or�as�customer\'s�special�requirement |
Payment | TT�or�L/C |
Delivery |
Within�****5�days�if�pipe�in�stock Within�****0�days�if�pipe�need�to�be�produced |
Contact:aley��SKYPE:aleyshi�Cell:**************6 |