FOB Price
Get Latest Price58888 / Unit
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Unit
Packaging Detail:
Polish wax before shipment
Delivery Time:
20 days production time
Supplying Ability:
200 Unit per Month
Payment Type:
T/T, L/C
Contact Person Mr. John
Liangshui District, Suizhou, Hubei
Shacman Concrete Truck Mixer |
|
Truck Model |
***0GJBA |
Chassis Model |
ZZ***1 |
Chassis Brand |
Shacman |
Engine Model |
WD**5.*5 |
Engine Company |
Weichai |
Engine Exhausted(cc) |
***6 |
Engine horsepower(kw/hp) |
**7/**6 |
Cabin |
low-roof half-float standard cabin (hydraulic mechanic turning-up) |
Axle Load(kg) |
***0/****0/****0 |
Max Speed (km/h) |
*0 |
Tyre Specification |
*1.****0 |
Wheelbase(mm) |
***0****0 |
GearBox |
Shanchi 8 speed |
Frame (mm) |
**0**0*(8*8) |
Rear Axle |
*3T(double) |
Drum Specification |
|
Drum Materail |
Q**5 |
Angle of Drum Inclination |
*1.5 |
Geometric Volume |
*7.3 |
Filling Ratio |
*8.7% |
Inlet Speed(CBM/min) |
>3 |
Outlet Speed(CBM/min) |
>2 |
Remainder |
<0.7% |
Delivery Term |
|
Delivery Time |
In Stock |
Delivery Port |
Shanghai |
Delivery Term |
FOB |
Payment |
T/T |
FOB Shanghai(USD/Unit) |
****1 |
Payment |
*0% down payment , the balance be paid before shipment after your confirmation. |