FOB Price
Get Latest Price5 ~ 10 / Square Meter ( Negotiable )
|Minimum Order
Place of Origin:
shanghai
Price for Minimum Order:
Minimum Order Quantity:
1000 Square Meter
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
1000000000 Square Meter per Month
Payment Type:
T/T, L/C
Contact Person gang
Zhabei District Gonghexinlu 3088, Lane(Xiang Teng, Fortune Plaza, Room 1102, Building 7,), Shanghai, Shanghai
Floor
Deck (steel bearing plate, construction steel sheeting) is
cold-formed of galvanized steel sheet by roll forming,
cross-section into a V-shaped, U-shaped, trapezoidal or similar
shape of these types of waveforms used as permanent
formworkalso can be selected for
other purposes.
(A) it is called:
Combination
of floor, floor boards, steel bearing plate, pressure plate, floor
plate, the steel floor boards, the combination of floor plate,
galvanized steel bearing plates, galvanized floor plate, galvanized
floor boards, the combination of floor boards, the combination
offloor, floor
steel bearing plate, construction steel sheeting, composite slabs,
etc., are divided into: opening the floor boards, the whole closed
for floor boards, dovetail floor boards etc.
(B) the main features:
1:
to adapt to the rapid construction of the main steel structure, to
provide a firm platform for the job in a short period of time, and
can use more than one floor laying pressure plate, stratified flow
construction for pouring the concrete slab.
2: use
the stage floor boards as a concrete slab tensile reinforcement,
but also improve the stiffness of the floor, saving the amount of
steel and concrete.
3: The
pressure plate surface embossed to produce the greatest binding
force between the floor boards and concrete, so that the two form
an overall, together with the stiffener, so that the floor plate
system with high-strength bearing capacity.
4: the conditions of the
cantilever under the floor boards only as a permanent
template.Cantilever the
length of the section properties of the floor
boards.In order
to prevent the cracking of the cantilever plate, need the supports
of the Structural Engineers of the design coupled with negative
reinforcement.
5:
the floor boards of the Company by the National fixed fire
extinguishing systems and fire-resistant component quality
inspection center fire resistance testing, as a combination of
floor boards do not need to fire the spray, thus greatly reducing
the project cost.
(C) Application:
The products are widely used in power plants, electrical equipment
company, car showroom, steel plant, cement warehouse, steel
structure office, airport terminals, railway stations, stadiums,
concert halls, Grand Theatre, a large supermarket, logistics
center, the Olympicvenues,
sports venues and other steel construction.
(D) of product testing
a dynamic loading test, qualified for floor boards is subject to
several groups of dynamic load test, draw the shear of the
composite board - bond coefficient, test out Even for the board and
concrete binding capacity obtained in the large
spanbear on the design
load.
b, fire test, the floor three groups in the fire-resistant
laboratory 1.5 hours, two hours and three hours to load fire test
for simultaneous measurement of temperature distribution within the
slab, test out Even Deck whether the insulation
requirements,refractory phase
of the positive moment resistance.
(E) Floor Deck Construction and
use
Profiles thick, floor boards, 0.*5mm, 0.8mm, 1.0mm, 1.2mm, 1.5mm
wide and **8mm ~ **8mm ~ **0mm ~ **0mm ~ **5mm ~ ***5mm high 5 1 mm
~ *6mm ~ *5mm long project requirements
customized.Engineering floor mezzanine deck and
reinforced concrete structure together, the composite
structure.Laying
floor boards to steel beam connections, the board ends and the
steel beam penetration welding, intermediate studs with steel beam
penetration welding; between the floor boards with special clamping
clamp occlusion pressure Kong connection; with special
pluggalvanized plug boards and
floor boards and steel beam spot.If it is with the arc of
floor boards profiled cutting and plasma cutting machine cutting,
smooth the cut surface of galvanized layer
integrity.Floor
plate welding using manual arc welding electrode for the E***3,
3.2mm diameter, the penetration welding point is *6mm. The original
design of a pad pitch of **5mm after the solder is increased by 1,
to ensure that the operator walking floor boardsdeformation, the end of pouring concrete when
the floor boards slurry leakage.When
the elevation change of floor layer structure is inconsistent, plus
welding steel measures taken, the level structure showed a step
transition, when the elevation of the lower I-beam webs plus
welding angle; uplift elevation joist flange and weld
channel.Encountered
floor reserved for the hole size is generally the first open hole
measures more than **0mm × **0mm, the increase in the steel beam
welding steel joists separated to increase the hole stiffness, mesh
reinforced disconnect in the hole, andwelding
steel; hole size of less than **0mm × taken **0mm when open hole
measures, namely the partition plate in the floor board to increase
the plug, mesh reinforced through, cut reinforced concrete pouring
molding
(F) Floor Deck Installation
Notes
Steel column gateway from the general 5 to 9.0m × 8 ~ *5m, the
secondary beam spacing of 3m, cutting the length of the floor plate
is 4.*7 ~ 8.*7m, transport and install than those in difficulties,
especially with vertical lifting floor from the arc
zonefor the
board, from top to bottom to wear in the secondary beam Hazama sets
is more difficult, and disrupted the normal beam welding
process.Control the cutting length is 3
~ 6m, you can avoid the problem of vertical transportation between
the secondary beams can not be lifted.The floor board when lifting using a dedicated
soft sling.Each lifting
should check soft sling is torn, cut off
phenomenon.The floor boards
shelved on steel beams should be to prevent the
probe.Shop
materials, the operator should wear a seat belt, and to ensure that
the side laying the edge of fixed ropes in the perimeter
security.Welding
penetration spot welding, the welding should be prepared to scrap
arc test welding and adjusting welding current level templates and
vertical support for the bottom of the floor boards, cloth when
pouring concrete should not be too concentrated, the use of
flat-panel vibratorstimely assessed
vibrators.