FOB Price
Get Latest Price4500 ~ 5000 / Set ( Negotiable )
|Minimum Order
Place of Origin:
Shandong,China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
professional package or as equired
Delivery Time:
within 10 days after deposit
Supplying Ability:
50 Set per Month
Payment Type:
T/T
Contact Person Ms. Grace
zhenzhong street, Yantai, Shandong
Feature:
l Platform is cutted by large-scale numerical control panel once shaping and smooth cutting.
l Platform be made of high-quality manganese steel plate by carbon dioxide gas shielded arc welding from welding, high strength, rigidity, and many technology-holes can be easily arranged anchor device.
l The hydraulic sidewise lift platform and loading ramp facilitates any accident-handling vehicle up and down conveniently.
l Reasonable platform height makes operation conveniently. Humanized Design for the main clamp can realize the adjustment of main clamp upper and lower, before and after between the least bit.
l The wealth of tools to prepare, for the arbitrary choice of the operator.
l At the same time, two-pulling towers composite pulling, and more reflect the superiority of partial pull-out operation.
Specifications:
Platform Length****************- ***0mm |
Tower Max. Tension***************5KN |
Platform Width**********************0mm |
Hydraulic Pressure**************0MPa |
Platform Height**********************0mm |
Pneumatic Pressure***********0.8MPa |
Max. Lifting Weight****************0kgs |
Tower Working Rang********0degree |
Total Weight*************************0kgs |
Total Cubic Measure**********6.5CBM |