FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
Henan
Price for Minimum Order:
-
Minimum Order Quantity:
1 Unit
Packaging Detail:
Plywood case professional packaging transportation
Delivery Time:
Within 20 working days
Supplying Ability:
200 Unit per Year
Payment Type:
L/C, T/T
Contact Person yoyo
Hanghai East Road, Zhengzhou, Henan Province
1.The structure of boileris compact and reasonable .this product is compossed of three part:boiler body, chimneys and piping systems. and body and chimney have been manufactured in the factory.piping system will be installed ,when it was transported to the site. At the site we connected to the gas source ,power, and water mains and can guranteee product quality .
2. The design performance of boiler is advanced . the boiler body is the overall structure . the burner was assembled in the first smoke cover .
3.The water cycle is simple ,and water quality can be guranteed
4. The techniques are advanced .