Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Industry Aluminium profile

Industry Aluminium profile

FOB Price

Get Latest Price

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

-

Minimum Order Quantity:

5 Metric Ton

Packaging Detail:

shrinking paper, protetive film, brown paper, etc according to customer

Delivery Time:

3-4 weeks for the first order of one container

Supplying Ability:

2000 Metric Ton per Month

Payment Type:

T/T, L/C

Contact Now
Free Member

Contact Person Evon

R308-309, LeHeng business building, Baiyun District, Guangzhou, Guangdong

Contact Now

Description

1Main features 
      1).Good experience in extruding profiles for industry, very mature technology in dies making 
      2). Main profiles for Machinery, electronic products, family appliance.
      3). Very hgih percision in toerlance.
      4).Different surface treatment is provided like mill finish ,anodized.   
      5).Suitable and protective packing is provided

2General Introduction
      1). Factory sizeAbove**0,**0 square meters with *7 press production line,from **0ton****0ton
      2). Production capacity***0 Tons per month
      3). Alloy availablealloy ***3 / ***1 / ***0 / ***5 are available subject to final design
 
Alloy
Si
Mg
Fe
Cu
Mn
Zn
Cr
Ti
***3
0.**0.6
****0.9
<0.*5
<0.1
<0.1
<0.1
<0.1
<0.1
***1
0.**0.8
0.**1.2
<0.7
0.***0.4
0.*5
0.*5
0.***0.*5
<0.*5
***0
0.**0.6
0.***0.6
0.1
0.1
<0.1
0.*5
0.*5
0.1
***5
0.**0.9
0.**0.6
0.*5
0.1
0.1
<0.1
<0.1
<0.1

      4). Maximum size availableOutside diameter of **0mm
      5). Die/Mould ready day7 to *0 days after down payment & drawings are confirmed.
      6). Ordering process:
             Samples ——①—→ Drawings confirmed ——②—→ Die/Mould Making ——③—→ Samples and colour confirmed ——④—→ Mass production
       ① Make the drawingws within 5 days
       Make the Die/Mould and tooling in about **3 weeks
       ③ Confirm the new samples and the colour
       ④ Mass production will be finished in about **3weeks subject to quantity and details.

Send a direct inquiry to this supplier

To:

Evon < Wise Build Enterprise Ltd. >

I want to know: