FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Unit
Packaging Detail:
Paper box and wood box
Delivery Time:
10-30 days
Supplying Ability:
200 Unit per Month
Payment Type:
T/T, L/C, Western Union
Contact Person Ms. Carol
NO.99 INDUSTRIAL PARK NANPING WEST RD.,XINDIAN, Fuzhou, Fujian
1. Convenient |
2. Collapsible handgrip,integrated central control panel design,convient operation, safe and reliable and in accordance with human ergonomics. |
3. High-power (7.5HP) frequency conversion motor to meet requirements for the long and frequent grinding of industrial floor. |
4. Automatic pressure adjust control sytem meet different needs of construction technology. |
5. It can equip with vacuum equipment to achieve dry and wet working mode. |
6. Multifunctional abrasive plates can install all kinds of grinding accessories to reduce cost as much as possible |