FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
wooden box
Delivery Time:
within 30 days
Supplying Ability:
-
Payment Type:
T/T
China
Contact Person cynthia
developed area of xintai , shandong , china, Taian , Shandong
JYN***2 push-hand AC metal -enclosed switchgear : three-phase AC current, *0HZ, 3.***2KV single busbar whole equipment as receiving and distributing electricity.
The switchgear has fixed cabinet and movable handcart. The meter chamber, main busbar chamber,current mutual inductance chamberand handcart chamber are combined with fastener. And all chambers are seperated structure with thin steel sheet welded.
It can be combined in various major loop up to different function unit, so we could realize the function ,outlet and inlet line of cable and overhead, right-left communication.