FOB Price
Get Latest Price0.1 ~ 1000 / Piece
|Minimum Order
Place of Origin:
cangzhou city, hebei province, china
Price for Minimum Order:
Minimum Order Quantity:
100 Piece
Packaging Detail:
according to customer's requirment
Delivery Time:
15 days
Supplying Ability:
10000 Piece per Month
Payment Type:
T/T, L/C
Contact Person Ms. anna
yanshan, Cangzhou, Hebei
Connectors and End Caps | |
Material: | Stainless Steel **1/**4/**6 |
Surface: | Satin or Mirror finish |
Fit pipe size: | *8.1mm,*2.4mm, *8mm, *0.8mm |
For glass: | Thickness 8mm *0mm *2mm |
Function: | Railing hardware |
MOQ: | **0 pieces/order |
Delivery time: | ****0 days, depends on the order quantity. |
Payment term: | T/T *0%**0% deposit, balance before delivery and shipment. |
Packing: | Each one in a small fibre bags and **0 PCS in one carton. |
How to order from us ? | |
1. Negotiation: We send you the quotation by offering the price, material, delivery time, payment terms. ect |
|
2.Design: CAD drawing details will be made for your confirmation only after receiving your approval to our quote and PI . |
|
3.Place Order: According to the drawing design which you have confirmed as well as the PI. |
|
4.Production: As per confirmed drawings on detail dimensions. |
|
5.Delivery Time: Will be finalized after your confirmation to the drawings and deposit received here in our factory . |