FOB Price
Get Latest Price30000 ~ 80000 / Unit
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
5 Unit
Packaging Detail:
nude
Delivery Time:
20 days
Supplying Ability:
100 Unit per Month
Payment Type:
T/T, L/C, D/A, Western Union, Money Gram, PayPal
Contact Person kevin
China, Fuyang, Anhui
A、Whole Vehicle | |
Outer Dimension | ****0mm(length)x***0mm(width)x***0mm(height) |
Unladen Weight | ***0kg± 3%(maximum) |
Maximum Payload | loading ****0L gasoline:****0kg(gasoline density0.*2kg/L) |
Full Loading Whole Vehicle Weight | loading ****0L gasoline:****0kg |
B、Tank Body | |
Material | Aluminum Alloy ***4 |
Tank | Aluminum Alloy 5.5/***4 H*2 |
Capped End | Aluminum Alloy 6.0/***4 O |
Baffle | Aluminum Alloy 5.5/***4 O |
Referring Design Code | UN ADR |
Shell Accomplished Status | inside:vacuum cleaning |
outside:grinding and polishing | |
Section Shape | semi-ellipse section |
Volume | ****0L(****0L*5% upper oily gas space) |
Compartment Quantity | connected compartments |
Shoulder Protection Board | shoulder protection board is at least *5mm higher than manhole highest point,the drainage hose goes through to the racks of ladder for running water. |
Manhole Cover and Vent Valve | EMCO manhole cover(type F***2 series),each manhole equipping with breathing valve,a manhole box is necessary to equip,which should not be higher than shoulder protection board. |
B、Pipe fitting and pipe | |
submarine valve | 4EMCO(Model F*******1)submarine valve,according to API RP***4 standard latest edition. The depth of settlement sink for installing submarine valve is **0mm,which should be considered of being capable to be dismantled from tank bottom. |
discharging valve | EMCO brand(Model F******2)aluminum alloy API release valve,with dust-proof cover(type F******1), the valve center distance not smaller than **0mm,the distance from valve center to floor at off-load 0.9m. |
discharging connector | **4EMCO(Model F***9 series)or aluminum alloy gravity discharging connector with same effect. |
oil gas recovery system | EMCO(Model F******1)air dynamic high fluid rate oil gas recovery valve,4inside tank oil gas collecting pipe connecting to 4oil recovery fast connector(Model F******0,with mirror flange). Set a drainage cock at the lowest point of oil gas recovery for cleaning the accumulated water of oil gas pipe.(if necessary). The connector should be at the right side of tank vehicle,and at left side of discharging valve, with a horizontal center distance of **0mm to discharging valve. The height gap of the two centers should be not more than **0mm. |
oil overflow protection system | The design of oil overflow protection system should conform to API RP ***4 latest edition requirement, adopting EMCO brand 5 line visible oil overflow protection system including follows:*installing 5 line system glass fiber sense-transiting detector at each compartments,directly at manhole cover end or *0mm towards inside by screw connector to fix on the tank shell. The temperature scope is designed at **0℃~**0℃ with anti-fox function,and the response time from sense-transiting detector to indicating interface is not more than 0.5 second. *one visual overflowing/earthing socket assembly conforming with the 3rd part of API RP ***4 * equipping safety wires for connecting glass fiber sense-transiting detector/earthing bolts and socket assembly. |
air dynamic controlling system | This system should be assembled with braking system and provides interlock protection. It includes submarine air dynamic controlling block and loading/unloading lock post, which contacts air dynamic loop when opening,to make vehicle braked. |
emergency cutoff switch | EMCO(type F******2),2pcs(tank front part and rear part) |
tank bottom pipe | 4 aluminum alloy pipe system,pipe design pressure 5(*5psi)。 |
anti electrostatic system | 3m extending coil electrostatic disc |
electrostatic leading cable | cobber |
C、Accessories | |
ladder | dismantling aluminum alloy ladder at rear part,with step loading capacity of **0 Pounds. |
aisle platform | **0mm width of aluminum alloy mesh board will be paved between shoulder protection board. |
tank top handrail | aluminum alloy,fixed at one side of tank top platform, manual controlling mode,*******0mm higher than tank top at opening status. |
discharging box | aluminum alloy,upwards overturning structure,setting water releasing valve at bottom. |
hose box | no |
discharging hose pipe | no |
extinguisher bucket | 4 pcs,9Kg extinguisher |
tool box | aluminum alloy,at left side of tank |
safety cone barrel | 1pc,at the middle of tank left side |
D、Semitrailer Manufacture and Assembly | |
semitrailer frame | aluminum alloy |
axle and suspension system | 3 axles,BPW*0 ton axle(drum brake),air suspension,front-axle elevation,without odometer |
landing gear | JOST,installing at front part of trailer,rock-shaft at right side. |
traction pin | *0# JOST traction pin |