FOB Price
Get Latest Price( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Barrel
Packaging Detail:
by barrels
Delivery Time:
7days
Supplying Ability:
5000000 Kilogram per Year
Payment Type:
T/T
Contact Person Ms. xiaoli
Shengcheng, Shouguang, Shandong
Specification:
Type |
Single Component Polyurethane Waterproof Coating |
|
Film Thickness Dosage |
1.0mm |
1.5mm |
1.7kg/ sqm |
2.5kg/sqm |
|
Type |
Single component |
|
Application Method |
Knife-coat; Roller coating; Spray |
|
Packing |
*5kg/ barrel; *0\'ft container: **0 barrels, *1.*5 tons. |
|
Color |
Red or customized |
Applications:
Widely used in roofs, basement,
toilet, swimming pool, and all kinds of industry and civil building
waterproofing.
Application technology:
1) Substrate need be firm, smooth, no sundries, inside corner and outside corner should be made into circular arc, the diameter of insider corner should be more than *0mm, and the outside corder should be more than *0mm.
2) Ingredient and dosage: according to application dosage, evenly mixing round o use.
3) Reference dosage: coating film dosage is about 1.**1.5kg/sqm when the thickness is 1mm.
4) Large waterproof application, coating uniformity mixed coating with a rubber or plastic scraper, the thickness is consistent, generally it is 1.5mm to 2.0mm, should be brushed in 3 to 4 times, the last time brushing should be done after the previous brushing cures and becomes film, and brushing at a vertical direction. Generally as a separate film-forming, for underground project board, should pave a layer of felt reinforced material in addition.Coating thickness: to underground project thickness is 1.2 to 2.0mm, generally 1.5mm; to toilet thickness is not less than 1.5mm; to multilayer waterproof of exposured roof construction thickness is not less than 1.2mm ; to one layer waterproof of grade III waterproof, thickness is not less than 2mm;Fishing layer application.scatter the cleaned sand before the last time brushing is not solidified.
5) Protection layer: on the coating film surface should do insulation protection as the design.
Storage and attention items:
1) Keep materials in the room which is dry and ventilating
2) Avoid direct sunlight when transportation, avoid collisions and attention to fire
3) 6 months from date of production if stored properly in undamaged and unopened original sealed packaging in dry and cool conditions.