FOB Price
Get Latest Price42100 ~ 46500 USD / Set
|1 Set Minimum Order
Country:
China
Model No:
ZL50 2014 newest appearance made in china
FOB Price:
42100 ~ 46500 USD / Set Get Latest Price
Place of Origin:
-
Price for Minimum Order:
42100 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
container or ro-ro
Delivery Time:
15-25 days
Supplying Ability:
500 Set per Year
Payment Type:
T/T, L/C
Product Group :
Contact Person Mr. jack
feida road, Weifang, Shandong
performance | rated load | ***0kg |
total weight | ****0kg | |
rated bucket capacity | 3m³ | |
max.tractive force | **2kn | |
max.breakout force | **0kn | |
max.grade ability | *0 | |
max.dumping height | ***0mm | |
max.dumping reach | ***0mm | |
overall dimension(L*W*H) | ***0****0****0mm | |
min.turning radius | ***0mm | |
engine | model | WEICHAI STEYR WD**5G.**0 |
type | inline, water cooling, dry cylinder,injection | |
cylinder-number/bore&stroke | 6/**6***0mm | |
rated power | **2kw | |
rated speed | ***0r/min | |
max.torque | **0n*m | |
min.fuel-consume tatio | **5g/kw.h | |
transmission system | torque converter | YJ**5 |
gearbox mode | planetary | |
gearshift | 2 forward, 1 reverse | |
max.speed | *8km/h | |
drive axles | main reducing spiral | bevel gear grade 1 reduction |
decelerating mode | planetary reduction,grade 1 | |
wheel base | ***0mm | |
wheel tread | ***0mm | |
min.ground clearance | **0mm | |
hydraulic system | working pressure | *8MP |
boom lifting time | 5.*9s | |
total time | *0.*5s | |
fuel tank capacity | **0L | |
function of leveling automatically | yes | |
brake system | service brake | air over hydraulic disc brake on 4 wheels |
parking brake | manurl king-king-hub brake | |
tyre | tyre | *3.***5 |
front tyre pressure | 0.4MP | |
rear tyre pressure | 0.*5MP |
Country: | China |
Model No: | ZL50 2014 newest appearance made in china |
FOB Price: | 42100 ~ 46500 / Set Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 42100 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | container or ro-ro |
Delivery Time: | 15-25 days |
Supplying Ability: | 500 Set per Year |
Payment Type: | T/T, L/C |
Product Group : | 3.0 t-5.0 t wheel loader |