Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 10 Million Importers & Exporters globally. Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
BASE SKIM COAT
Next

BASE SKIM COAT

FOB Price

Get Latest Price

|

1TON Minimum Order

Country:

China

Model No:

U01

FOB Price:

Get Latest Price

Place of Origin:

CHINA

Price for Minimum Order:

-

Minimum Order Quantity:

1TON

Packaging Detail:

-

Delivery Time:

3-5 DAYS

Supplying Ability:

500TON/DAY

Payment Type:

-

Product Group :

-

Contact Now
Free Member

Contact Person Ms. Cindy

Tianhe, Guangzhou, Guangdong

Contact Now

Product Specification

Product Description

U*1 base skim coat is a good cushion for the compressive stress between different wall surfaces. It applies on leveling both interior and exterior cement or concrete surfaces which is ragged so that to reduce the usage of top coat and project cost. Features 1. Applied as a base layer prepared for top coat 2. Low maintenance, economical 3. Impervious to termites 4. Good bonding to substrates 5. Moisture and mould resistant 6. Cost effective 7. Non-toxic Surface preparation The solid substrate should be clean, dry and free of oil, grease, wax, latex compounds, curing compounds, dust and all foreign matter. Application 1.With right amount clear water (approximately 3.3:1) furnishing clay shape 2.According to its, first pours into the clear water stirs in the feeding trough, then joins the powder material, then stirs the even non- pellet paste with the electrically operated mixer to stick the shape, settles several minutes slightly to do again stirs, the effect is better 3. Evenly spreads with the putty the glue wipes in the basic plane, its thickness control in 1.5~ 2mm 4. After *4 hours do solidly, only then carry on the surface layer putty the construction. 5. Do not add water into the cured putty and reuse it. Precautions 1. It should not be directly applied on gypsum plaster, metal, rubber, PVC, wooden, earth based chip plate, gas concrete, and under floor heating, painted or tiled surfaces. Contact with the company for other solutions. 2. Avoid the use of excessive moisture during application. 3. Do not apply on concrete surfaces before 7 days set-time. 4. Do not work below 5 degree or below *0 degree. 5. On interior application, openings in the building (windows, doors, ect.) should be covered to avoid excessive wind which could cause premature dry-out. Coverage: **5kg/m2 Color: grey/ white Remark Main ingredient: concrete polymer, hydrophobic Package: *5kg/bag Package: *5kg/bag Storage: shelf life is minimum 1 year when stored in covered and dry environment.

Country: China
Model No: U01
FOB Price: Get Latest Price
Place of Origin: CHINA
Price for Minimum Order: -
Minimum Order Quantity: 1TON
Packaging Detail: -
Delivery Time: 3-5 DAYS
Supplying Ability: 500TON/DAY
Payment Type: -
Product Group : -

Related Products GUANGZHOU MASTER BUILDING MATERIAL CO., LTD

Send a direct inquiry to this supplier

To:

Ms. Cindy < GUANGZHOU MASTER BUILDING MATERIAL CO., LTD >

I want to know: