Looks like you are not TradeKey.com's Member yet. Signup now to connect with over 11 Million Importers & Exporters globally. Join Now, its Free |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Chemical anchors
Next

Chemical anchors

FOB Price

Get Latest Price

( Negotiable )

|

10000 Set Minimum Order

Country:

China

Model No:

004

FOB Price:

( Negotiable ) Get Latest Price

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

10000 Set

Packaging Detail:

in carton

Delivery Time:

5 days after receiving the deposit

Supplying Ability:

-

Payment Type:

T/T

Product Group :

-

Contact Now
Free Member

Contact Person Sunny

Huainan, Anhui

Contact Now

Product Specification

  • Other Names: chemical anchor bolt
  • Classification: Double Components Adhesives
  • Usage: Construction
  • Brand Name: Yi Maoling
  • specification:M12*160

Product Description

Description
Chemical anchor bolt is a kind of chemical adhesives. Fix the high-strength threaded rod into the drill hole of concrete base material by the function of cementation and chain. Its a post-installed fastenings technology, which is widely applied in Chinese engineering.
 
Features
·Resistant to acid, alkali, low temperature and aging
·Good heat-resistance performance, without creep deformation at the usual temperature 
·Resistant to water damage, steady load in longterm and moist environment and good quake-proof performance
·Strong anchoring force just like embedded parts
·Without swelling stress and small edge spacing
·Quick installation, rapid solidification and saving construction time
·It is easy to see the quality of the product with glass tube packing
·When the glass tube is smashed it can act as fine aggregate to bond well
·Fully sealed package and stable performance

Applications
·Fix machines and equipment
·Connect and fix steel structure and concrete
·Fix chemical pipes, equipment pipelines, crane rails and other construction equipment
·Fix brackets of various curtain walls , such as, glass, stone and aluminum-plate curtain wall. Fix brackets, bases and keels of various composite materials curtain walls.
 
Packing
Carton packing
 
Transportation & Storage
·As a non-dangerous product , it can be transported as common chemical building material.
·Must not expose to the hot sun and rain. Avoid damaging the packing.
·The product should be stored in a shady and dry warehouse(5~*5) Storage period is 6 months.
 
Cautions
·Thoroughly clean the drill hole. If necessary, rub the concrete hole with clean cotton dipped in little acetone or alcohol.
·Must not move the rod before curing
·Protective products must be taken, such as, gloves, masks, goggles and safety helmets.
·In case of skin or clothes contact, clean with acetone and flush with plenty of    water.
·If swallowed or splashed into eyes, contact physicians immediately.
 

Country: China
Model No: 004
FOB Price: ( Negotiable ) Get Latest Price
Place of Origin: -
Price for Minimum Order: -
Minimum Order Quantity: 10000 Set
Packaging Detail: in carton
Delivery Time: 5 days after receiving the deposit
Supplying Ability: -
Payment Type: T/T
Product Group : -

Send a direct inquiry to this supplier

To:

Sunny < Huainan Jinde Industry Co., Ltd. >

I want to know: