FOB Price
Get Latest Price1 USD / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
-
FOB Price:
1 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
1 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
seaworthy packaging
Delivery Time:
40 to 45 days after getting deposit
Supplying Ability:
30 Set per Month
Payment Type:
T/T
Product Group :
China
Contact Person Mr. Ru
No.3-1008 Mining University NanDu International Building, QuanShan District, Xuzhou, Jiangsu
Our company offers non electric cooling tower & water turbine.
1. Technical Principles
Hydraulic fan, as the name suggests, it is to use water other than traditional electricity to drive the fan. In hydraulic fan cooling tower, hydraulic turbine is used to replace motor as the power source for fan. Driving force for running hydraulic turbine comes from surplus energy of the system.
The core of the water kinetic energy recovery cooling tower technology and cooling tower reconstruction technology
is a mixedflow hydraulic turbine developed by our company based on thermal properties of cooling tower and the
hydraulic properties of circulating system. The recovery rate of the turbine is high, with which **0% energy-saving can be reached from the reconstruction of cooling tower circulating water system with surplus low energy. The
water flow into hydraulic turbine can distribute symmetrically against the rotating shaft of hydraulic turbine, the impacts
on hydraulic turbine can be balanced, the vibration arising during the operation of hydraulic turbine can be reduced
and the cooling tower can be operated more stably.
3. Technical Advantages
1) Visible effects, **0% energy saving of fans and motors, and the recovery period is about one and a half years.
2) Eliminate all the electrical systems, which leads to easy maintenance, low failure rate, and high safety performance.
3) Low maintenance costs.
4) Short reconstruction period, with no major change in entire circulating water system, can usually be completed within ***0 days.
5) Double water inlets reduce vibration and noise.
6) High energy utilization rate of the system surplus energy, with the total utilization rate of about *0%.
7) Push the water pump operating point to the high efficient area, so as to operate at the best conditions, while saving energy,
it also extends equipment use life.
Comparison Table of Power Consumption between Traditional Cooling Tower and Water Kinetic Energy
Cooling Tower
Cooling Tower Specification (Ton/Hour) |
Fan Power (KW) |
Daily Power Consumption of Fan (KWH) |
Annual Power Consumption of Fan (KWH) |
Power Consumption of Water Kinetic Energy Cooling Tower (KWH) |
Energy-saving Efficiency (RMB/*0,**0) |
1,**0 |
*5 |
1,**0 |
**6,**0 |
0 |
*9.*0 |
2,**0 |
*0 |
2,**0 |
**2,**0 |
*9.*0 |
|
3,**0 |
**2 |
3,**8 |
1,**5,**0 |
*7.*0 |
|
4,**0 |
**0 |
3,**0 |
1,**7,**0 |
*9.*0 |
|
5,**0 |
**0 |
4,**0 |
1,**4,**0 |
*7.*2 |
Performance Comparison Table
Comparison Items between Traditional Cooling Tower and Water Kinetic Energy Recovery Cooling Tower |
Traditional Cooling Tower |
Water Kinetic Energy Recovery Cooling Tower |
Water |
It is necessary to compensate water often |
It is unnecessary to compensate water often |
Electricity |
Every one hundred tons circulating water consumes **6 KWH power each hour. |
No power consumption |
Operating Cost |
High |
Low |
Reliability |
It is necessary to often carry out routine maintenance for electric motor and reduction gear box |
It is unnecessary to often carry out routine maintenance for electric motor and reduction gear box |
Safety |
It is necessary to equip with explosion-proof motor and electric control device |
It may work in any areas which require explosion-proof |
Environmental Protection |
Water drift, nose, and vibration impact on the environment |
No pollution |
Cooling Effect |
Good |
Good |
Water Drift Rate |
Higher |
Lower |
Applicability |
Suitable for any circumstances which require mechanical ventilation cooling tower |
Suitable for any circumstances which require mechanical ventilation cooling tower |
Mechanical Noise |
Large |
Little |
Country: | China |
Model No: | - |
FOB Price: | 1 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 1 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | seaworthy packaging |
Delivery Time: | 40 to 45 days after getting deposit |
Supplying Ability: | 30 Set per Month |
Payment Type: | T/T |
Product Group : | cooling tower |