FOB Price
Get Latest Price2 ~ 10 USD / ( Negotiable )
|500 Piece Minimum Order
Country:
China
Model No:
ST-LF
FOB Price:
2 ~ 10 USD / ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
2
Minimum Order Quantity:
500 Piece
Packaging Detail:
wooden pallets
Delivery Time:
15-20days
Supplying Ability:
10000 Piece per Week
Payment Type:
Money Gram, Western Union, L/C, T/T
Product Group :
-
Contact Person Lee
Shijiazhuang, Hebei
EAC Cooling Tower Fill Introduction
EAC cooling Tower Fill is one of the most important components for exchange of gas and water in cooling tower. It is the major parts to improve the efficiency of cooling tower and make sure the economy and safe operation. With the development of the plastic industry, counter-current tower drench water plastic packing "S" shape ladder wave, obliquely wave, which has the heat dissipation ,good performance ,Ventilated small resistance, durable, based on the easy and other advantages, it is widely used in different types of large, medium, small, cooling tower.
EAC Cooling Tower Fill Specification
Name |
EAC Cooling Tower Fill |
Type |
Cross flow cooling tower fill |
Material |
PVC, PP, UPVC |
Size |
***0mm*any length |
Thickness |
0.35mm-0.*5mm |
Application Temperature |
*5℃~**5℃ |
Color |
Black |
Packaging Detail |
In bundle, film+wooden pallet or as your requests. |
MOQ |
**0 pieces |
Delivery period |
Within *5 days after receiving the deposit |
Welcome to contact us: admin at sintafrp.cn; skype:sinta***4
Country: | China |
Model No: | ST-LF |
FOB Price: | 2 ~ 10 / ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 2 |
Minimum Order Quantity: | 500 Piece |
Packaging Detail: | wooden pallets |
Delivery Time: | 15-20days |
Supplying Ability: | 10000 Piece per Week |
Payment Type: | Money Gram, Western Union, L/C, T/T |
Product Group : | - |