FOB Price
Get Latest Price|
3Ton Minimum Order
Country:
China
Model No:
XHDAC302
FOB Price:
Place of Origin:
Chengdu
Price for Minimum Order:
-
Minimum Order Quantity:
3Ton
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
500Ton
Payment Type:
-
Product Group :
-
Contact Person Ms. Yu
Chuangye Road, Chengdu, Sichuan
1. Application For anti-rust primer and workshop primer on steel surface, also on bridge, vessel, facilities of harbour and coal mine, underwater coating, sea equipment, interior and exterior of the oil tank and other areas. 2. Features 1. Interpenetrating network anti-corrosive coating to keep the coating from powder and improve the coating weather resistance. 2. Excellent coating film is with good cathode protecting and conduction of electricity, also with strong adhesion, weather resistance, water proofing and others. 3. Convenient to construction and solidification at room temperature. ***** 1.Preparation: First, mix fully to no sediments on the bottom of barrel. Then, add side hardener into coating as *0:1(weight rate). It is ready for use *5~*0 minutes later.And the best to do a trial about hardener. 2.Surface cleanness: Cleanness to national standard Sa2½ for metal structure. And keep it dry. Do paint primer within 4 hours. 3.Usage: Please use up the prepared primer within 3 *(@********************uld be not re-add into the primer. *****: Dry thickness at one time is about *5µm by high pressure no-gas spraying and gas spraying, about *0µm by hand brushing. 5. Comsuption in theory: Without consideration of coating environment, method, technology, surface and its structure, shape, and area, its comsuption is generally acceptable as 0.*4kg/m². 6.Advice application: For flat film, the better is to take as high pressure no-gas spraying, then gas spraying, hand brushing. 7. Thinner comsuption: Add XHDAC**2 thinner if the coating is too thick, as 1~5%. 8. Tools Cleanout: Use our XHDAC**9 cleaning agent, or XHDAC**2 special thinner, please. 9. Maintenance: It should take 7~*0 days to work after coating the last topcoat. Delay some days once temperature is under *0 ℃. 4. Package: Packed in iron drum, net weight: *0kg per drum, but thinner is *5kg per.
Country: | China |
Model No: | XHDAC302 |
FOB Price: | Get Latest Price |
Place of Origin: | Chengdu |
Price for Minimum Order: | - |
Minimum Order Quantity: | 3Ton |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | 500Ton |
Payment Type: | - |
Product Group : | - |