Product Description
PU Materials for Sports Runway
(Running Track and Field)
Product
description:
Nalstane sports runway PU
materials is fully MDI based polyurethane adhesive and PPG
copolymers, all parts passed SGS test of non-heavy metal and
Non-VOC contamination. It can be on-site casting to form
running track and field together with rubber particles and
EPDMparticles, which are
multi layers and imparts strong but flexible structure, endurable
color refreshing, and long time utilization. The installation
thickness is usually 9 or *3 MM(up to IAAF standard).
Description
1.long
time and enduring colorful.
2. All weather suitable.
3. strong surface can stand nail attacking.
4. Environmentally-friend.
Characteristics:
1. All weather suitable: suit for all
kinds of seasons and temperature range. It maintains high quality
and can be used after raining immediately, which increases the
time available and using frequency.
2. Perfect installation: special machines for construction ensure
different ranges of thickness and flatness.
3. Proper flexibility: multi-layers, which has measurable
flexibility and rebounce toreduce the risk of injury and enhance competition
achievements.
4. Anti-shocking: it has strong but flexible layer and cushion
layer, which can absorb the driving force without obvious
damage.
5. Anti-nail: It won't be destroyed by nail shoes or start
running even at the starting point of ***-meter lane which is
most frequently used.
6. Colorful appearance: we can provide various color matches. The
special configuration reduces direct sunlight damages, offers
beautiful appearance and it can well decorate the
environment.
7,Simple maintenance:
no special maintenance needed but the daily clean and
washing..
Application:
1. All kinds of running track for schools
and universities;
2. All kinds of running track for stadiums;
3. Track for Formal games/competition;
4. Sports and games flooring;
Runway types:
Mixed PU Runway with
Self–textured Skid-proofing Surface
1, priming coat: Rolling primer
coating onto concrete or asphalt substrate, to improve substrate
adhesion
2, intermediate elastic layer: Mix
Nalstane Runway Coating together with EPDM particles by the ratio
*0:3, install these mixing material onto construct with thickness
*0mm or required.
3, Surface coat: spray Nalstane
Self-textured runway surface coating onto intermediate elastic
layers.
Mixed PU Runway with EPDM
Particles for Skid-proofing
1, priming coat: Rolling primer
coating onto concrete or asphalt substrate, to improve substrate
adhesion
2, intermediate elastic layer: Mix
Nalstane Runway Coating together with EPDM particles by the ratio
*0:3, install these mixing material onto construct with thickness
*0mm or required.
3, Surface coat: Mixing the
Nalstane Runway Surface Coating and EPDM rubber particles with
ratio *0:3, and spray onto intermediate elastic layers, splash
EPDM particles onto the fresh coating immediately, after fully
curing, clean away free particles.
Composite PU Runway
1, priming coat: Rolling primer
coating onto concrete or asphalt substrate, to improve substrate
adhesion
2, intermediate elastic layer: Mix
Nalstane Runway Coating together with EPDM powders by the ratio
1:2, install these mixing material onto construct with thickness
*0mm or required.
3, Surface coat: Mixing the
Nalstane Runway Surface Coating and EPDM rubber particles with
ratio 1:1, and spray onto intermediate elastic layers.
Breathable PU Runway
1, priming coat: Rolling primer
coating onto concrete or asphalt substrate, to improve substrate
adhesion
2, intermediate elastic layer: Mix
Nalstane Runway Binder together with rubber particles by the
ratio 1:**8, install these mixing material onto construct with
thickness *0mm or required.
3, Surface coat: Mixing the
Nalstane Runway Surface Coating and EPDM rubber particles with
ratio 1:1, and spray onto intermediate elastic layers.
Country: |
China |
Model No: |
T-001, T-002
|
FOB Price: |
1 / Piece (Negotiable)
Get Latest Price
|
Place of Origin: |
- |
Price for Minimum Order: |
1 per Piece |
Minimum Order Quantity: |
10000 Square Meter |
Packaging Detail: |
Acrylic acid lacquer: 20kg/drum 78kg/drum |
Delivery Time: |
7-10days after receipt of payment |
Supplying Ability: |
- |
Payment Type: |
T/T, L/C, Western Union |
Product Group : |
- |