FOB Price
Get Latest Price1 ~ 2 USD / Piece ( Negotiable )
|1 Piece Minimum Order
Country:
China
Model No:
LY-SC01
FOB Price:
1 ~ 2 USD / Piece ( Negotiable )Get Latest Price
Place of Origin:
Shandong,China
Price for Minimum Order:
1 per Piece
Minimum Order Quantity:
1 Piece
Packaging Detail:
woven bags and onto iron pallet
Delivery Time:
in 25-35 days
Supplying Ability:
200 Ton per Month
Payment Type:
T/T, L/C, Western Union, PayPal
Product Group :
Contact Person Ms. Sarah
909.Shanghai Road, Rizhao, Shandong
The making flow of the Q**5 EN*4
BS***9 Drop Forged Swivel Scaffolding
Coupler
1.Design and make the model of the
scaffold coupler as per the clients'
request,
2.Purchase the raw material (Q**5
carbon steel),
3.Burn the raw materical and let it soft
to forge.
4.Forge the soft raw material and make it
like the model type,
5.Test the forged components and get rid
of the unqualified ones,
6.Sanding the forged qualified
items,
7.Test the finishing items in case there
are other bad quality ones when sanding
them
8.Polish the items and let their surface
more smooth,
9.Drill the necessary components to
assemble the screw
*0.Let all the components
galvanize
*1.Assemble all the components together to
let them be one total coupler.
*2.Test the whole set and let them test on
the scaffolding pipes.
*3.Pack all the items as per our clients'
requirement.
Advantage of us
1.We specially prodce the scaffold
couplers and have exported to many
countries,
2.We can provide you the material report
of the raw material
3.All the scaffolding couplers have been
tested many times before packaging,
4.All the scaffolding couplers have been
made as per the International standard
EN*4,BS***9,AS***6,
5.The surface treatment is galvanized or
hot dip galvanized and the life of the scaffolding is very
long.
Export Market
Distribution:
Market | Revenue(Previous Year) | Total Revenue (%) |
South America | USD **0.**0 | 4.7% |
Eastern Europe | USD **0.**0 | *4% |
Southeast Asia | USD 1.**0.**0 | *6% |
Africa | USD *0.**0 | 2.3% |
Mid East | USD **0.**0 | 7% |
Western Europe | USD *0.**0 | 1.4% |
Northern Europe | USD *0.**0 | 0.5% |
Southern Europe | USD *0.**0 | 3.7% |
South Asia | USD *0.**0 | 0.9% |
Machine Name | Quantity | Number of Year(s) Used | Condition |
Model Machine | 1 | 4 | Acceptable |
Drop forged machine | 4 | 3 | Acceptable |
Sanding Machine | 1 | 3 | Acceptable |
Drilling Machine | 2 | 3 | Acceptable |
Polishing Machine | 3 | 3 | Acceptable |
Assemble Machine | 2 | 1 | Acceptable |
Testing Machine | 1 | 2 | Acceptable |
Country: | China |
Model No: | LY-SC01 |
FOB Price: | 1 ~ 2 / Piece ( Negotiable ) Get Latest Price |
Place of Origin: | Shandong,China |
Price for Minimum Order: | 1 per Piece |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | woven bags and onto iron pallet |
Delivery Time: | in 25-35 days |
Supplying Ability: | 200 Ton per Month |
Payment Type: | T/T, L/C, Western Union, PayPal |
Product Group : | scaffolding couplers |