FOB Price
Get Latest Price20 ~ 60 USD / Set ( Negotiable )
|100 Set Minimum Order
Country:
China
Model No:
LY-FS01
FOB Price:
20 ~ 60 USD / Set ( Negotiable )Get Latest Price
Place of Origin:
Shandong,China
Price for Minimum Order:
20 per Set
Minimum Order Quantity:
100 Set
Packaging Detail:
iron pallet, steel pallet, in bulk etc
Delivery Time:
in 25-35 days
Supplying Ability:
200 Ton per Month
Payment Type:
PayPal, Western Union, L/C, T/T
Product Group :
Contact Person Ms. Sarah
909.Shanghai Road, Rizhao, Shandong
The size of the Q**5 Power Coated H Frame
Scaffolding System
�
Item | Size | Material | Main pipe | Other pipe |
Walk thru frame | ***0****9mm | Q**5 | *2*2.5mm | *7*1.5mm |
Walk thru frame | ***0****9mm | Q**5 | *2*2.5mm | *7*1.2mm |
Ladder frame | ***0****9mm | Q**5 | *2*2.5mm | *7*1.5mm |
Ladder frame | ***0****9mm | Q**5 | *2*2.5mm | *7*1.2mm |
Walk thru frame | ***0***0mm | Q**5 | *2*2.5mm | *7*1.5mm |
Walk thru frame | ***0***0mm | Q**5 | *2*2.2mm | *7*1.2mm |
Ladder frame | ***0***0mm | Q**5 | *2*2.5mm | *7*1.5mm |
Ladder frame | ***0***0mm | Q**5 | *2*2.2mm | *7*1.2mm |
Ladder frame | ***0***0mm | Q**5 | *2*2.0mm | *7*1.1mm |
Country: | China |
Model No: | LY-FS01 |
FOB Price: | 20 ~ 60 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | Shandong,China |
Price for Minimum Order: | 20 per Set |
Minimum Order Quantity: | 100 Set |
Packaging Detail: | iron pallet, steel pallet, in bulk etc |
Delivery Time: | in 25-35 days |
Supplying Ability: | 200 Ton per Month |
Payment Type: | PayPal, Western Union, L/C, T/T |
Product Group : | scaffolding |