FOB Price
Get Latest Price( Negotiable )
|1 Piece Minimum Order
Country:
China
Model No:
1-5MW Grade main shaft for WTG
FOB Price:
( Negotiable )Get Latest Price
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
Wood or Iron frame with plastic outside
Delivery Time:
40-60 days after PO confirm
Supplying Ability:
2000 Piece per Year
Payment Type:
L/C, T/T
Product Group :
Contact Person Levi
Jinan, Shandong
Main shaft for MW-class wind turbine
Tongyu has now become one of worlds
largest production bases of MW-Grade wind turbine shaft,
Which is a core part in wind turbine
to connect wind mill and gearbox or engine ,Wind turbine main shaft
are manufactured from steel ingot with forging,heat treatment ,and
finishing processes,
Since the cost of replacing shafts
is rather high,so the quality requirement in producing them must be
high.
The service life of Tongyu main
shaft is generally to be at least *0 years, Main shaft for MW-class
wind turbine processes large dimension. It calls for high
requirement in performance ,flaw detection,and metallographic
structure.
Tong yu provides main shaft of wind
turbine for various corporations,like GE Energy, Vestas, GAMESA,
Suzlon,
Anderson ,Sinovel, Guodian union,
CSIC wind power, Nanjing NGC group,etc.
Clients are required to offer their
drawings and technical requirement, Which will transferred to
technical department(heat treatment center, large forgings research
center, mechanical research center, and welding department, etc,)
for confirmaion and accounting, Then we will offer you the
quotation, The ordered products will be put into production as soon
as possible after clients have placed an order. For any
problems rasied in the product line ,We will contact and disscuss
with our clients directly.
Technical
Parameters
Materials | *2CrMo, *4CrNiMo6, etc.. |
Common main shaft models | 1.*5MW 1.5MW, 2MW, 2.1MW, 2.3MW, 2.5MW, 2.*5MW, 3MW, 3.3MW, 4MW, 5MW, etc.. |
Country: | China |
Model No: | 1-5MW Grade main shaft for WTG |
FOB Price: | ( Negotiable ) Get Latest Price |
Place of Origin: | China |
Price for Minimum Order: | - |
Minimum Order Quantity: | 1 Piece |
Packaging Detail: | Wood or Iron frame with plastic outside |
Delivery Time: | 40-60 days after PO confirm |
Supplying Ability: | 2000 Piece per Year |
Payment Type: | L/C, T/T |
Product Group : | Forgings |