FOB Price
Get Latest Price1.5 ~ 2 USD / Kilogram ( Negotiable )
|2000 Kilogram Minimum Order
Country:
China
Model No:
IC-2001-1
FOB Price:
1.5 ~ 2 USD / Kilogram ( Negotiable )Get Latest Price
Place of Origin:
Qingdao China
Price for Minimum Order:
1.5 per Kilogram
Minimum Order Quantity:
2000 Kilogram
Packaging Detail:
200KG/plastic barrel
Delivery Time:
15-20 days
Supplying Ability:
100 Ton per Month
Payment Type:
Western Union, L/C, T/T
Product Group :
Contact Person Ms. Sophia
Nanling 3 road, Qingdao, Shandong
IC-*****1Znic-Series phosphate coating
agent
1.
Overview
IC******1 phosphate coating
agent assigned two kinds including IC******1A for preparation and
IC******1B for adding, which is little-sediment and low-temperature
phosphating agent for surface phosphating of iron and steel parts,
cold-rolled sheet. There are some advantages, such as
low-temperature, fast filming, little sediment, light pollution.
Phosphate coating is thin and firm, dense and uniform, and nuclei
is small. The product is suitable for large-scale spraying line or
the combination of spraying and dipping with strong processing
capability.It is the
representative product of high-quality products bonderite developed
by our company.
2. Using
method
2.1 Tank liquor preparation (1
ton)
a. Tank reagent: IC******1A
zinc-series phosphate coating agent
IC******1B
zinc-series phosphate coating agent
NT***5 neutralizer
AC****1
accelerator
b. First, add water to tank with *0
% of the capacity of tank. Second, add NT***5 neutralizer of 4.5 to
5.0 kg. Third, add IC******1A of *0 kg and stir evenly until
flocculent precipitate was completely dissolved. Finally, adding
margin water, and stir evenly. Confirm process indicators ,
heat to processing temperature. Before using, add AC***0
accelerator of 1.6 kg and stir evenly.
2.2 Tank liquid
management
Total acidity: *8 to *6
Free acidity: 0.9 to 1.8
Accelerator: 2.0 to 5.0
Temperature: Dipping: *5 to *5
degrees
Spraying: *5 to *5
degrees
Time: Dipping: *5 to *5
minutes
Spraying: 2 to 4 minutes
Spraying pressure: 0.6 to 1.0
kg/cm2.
5. Notes
5.1 Degreasing and derusting must
be completely thorough. If phosphate film is not an ideal addition,
the workpiece can be immersed in pickling bath to remove the film
(must be remove completely), and then make phosphating coating
again.
5.2 After water rinsing process,
workpieces cant be maintained too long time in the air to prevent
rust, and the water of washing tank should flow in order to ensure
the quality of water.
5.3 Test TA and FA twice one day.
Accelerator is consumed quickly, usually test it twice one
day.
5.4 Phosphating workpieces should
be dried at **0 to **0 degrees after water rinsing , which can
increase erosion resistance. Natural-drying isnt a good
method.
5.5 Copper sulphate spot test
should be done after the workpiece was naturally dried and *2 hours
and the film was fully formed. Corrosion time is greater than *0
seconds.
Country: | China |
Model No: | IC-2001-1 |
FOB Price: | 1.5 ~ 2 / Kilogram ( Negotiable ) Get Latest Price |
Place of Origin: | Qingdao China |
Price for Minimum Order: | 1.5 per Kilogram |
Minimum Order Quantity: | 2000 Kilogram |
Packaging Detail: | 200KG/plastic barrel |
Delivery Time: | 15-20 days |
Supplying Ability: | 100 Ton per Month |
Payment Type: | Western Union, L/C, T/T |
Product Group : | phosphate coatings |